This site uses cookies to deliver the best possible service. Continuing browsing the site you consent to their use.

  • 1
  • 2
  • 3

condotte forzate

condotte forzate
 

One particular type of forced water conveying pipelines is designed to connect the hydroelectric dam with the turbines to maintain constant operating conditions.

The fundamental aspect of the forced water conveyor is the high operating pressure, which is equal to that of the dam’s geodetic elevation. Although pressure variation of such systems can be elevated, thanks to the forced water conveyor an overall stabilization of the pressure between the dam and the turbines is maintained.

Due to the nature of the mountainous terrain and numerous changes in direction along the pipelines, critical pressure points occur at various joints and for this reason our tubing is reinforced with metal coverings to prevent structural damage.

Our Clients

  • 1

References

Products

  • Slice Gates
  • Trashrakes
  • Forced Pipelines

Paratoie-su-ruote-5-350x263

Gru-a-pinza-2-350x263

Condotta-forzata-imbocco350x263

Certifications

  • UNI EN ISO 9001

    iso-9001-220x300

  • UNI EN ISO 3834

    ISO-3834-220x300

  • 1
  • 2
  • 3

Certifications

  • UNI EN ISO 9001

    iso-9001-220x300

  • 1
  • 2
  • 3
  • 4
  • 5

Our Clients

  • 1

References